After its operations since 1996, PT. Teknindo Geosistem Unggul had gained several experiences of soft soil improvement works:
- Over 50 works of geotextile
- Over 50 works of vertical wick drain
- Over 20 works of horizontal strip drain
- Over 20 works of geotechnical instrument
Those works had been executed/ implemented upon project as below:
- Highway
- Airport
- Seaport
- Container yard
- Industrial estate
- Real estate
- Sport area
Now, PT. Teknindo Geosistem Unggul has been able to provide a service in the areas of soft soil improvement works in a
"one stop services", which is integrated service includes:
- Design of soft soil improvement work
- Supply of geotextile, vertical wick drain, horizontal strip drain, and geotechnical instrument
- Installation of geotextile, vertical wick drain, horizontal strip drain, and geotechnical instrument
- Monitoring of geotechnical instrument
PT. Teknindo Geosistem Unggul also ready to implement the soft soil improvement work with a
“performance based contract”. As an example of performance parameters for the acceptance of soft soil improvement work are:
- Based on the settlement plate measurements with soil settlement <0.012mm/day.
- Based on piezocone test, with average degree of the consolidation in the consolidated layer >90%.
- Shear strength subgrade increased by 20%.